首页> 外文期刊>CIWM >Opinions Divided Over County Limerick Waste Facility
【24h】

Opinions Divided Over County Limerick Waste Facility

机译:关于利默里克郡废物处理设施的意见分歧

获取原文
获取原文并翻译 | 示例
           

摘要

Plans to develop a 4 000-tonne waste transfer facility on the site of the old Kantoher plant in Killeedy have split local politicians, with some firmly opposed to the project while others urge a "dialogue" with the local community.White's Skip Hire of Broadford [pictured] is currently exploring the possibility of renovating a disused section of the old Kantoher plant for its facility to separate recyclables from waste collected by its domestic bin service. The company has insisted that the facility will pose no risk to the environment and will create six to 10 new full-time jobs. However members of the Killeedy community have voiced strong opposition to the plans, fearing the facility will create vermin, noise and odour problems and may contaminate a local water supply.
机译:计划在基利迪(Keeleedy)坎特赫尔(Kanteedy)旧工厂的场地上开发一个4000吨的废物转移设施的计划,使当地政客分裂,一些人坚决反对该项目,而另一些人则敦促与当地社区进行“对话”。 [如图]当前正在探索翻新Kantoher旧工厂废弃部分的可能性,以将其设施从其家庭垃圾箱服务收集的废物中分离出来。该公司坚持认为,该设施不会对环境造成任何威胁,并将创造六到十个新的全职工作。但是,基利迪社区的成员对此计划表示强烈反对,担心该设施会造成害虫,噪音和气味问题,并可能污染当地的供水。

著录项

  • 来源
    《CIWM》 |2013年第2期|34-34|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号