NEC3 Briefing Note - managing project risks through the NEC3 Engineerng and Construction Contract

机译:NEC3简报-通过NEC3工程和施工合同管理项目风险

获取原文
获取原文并翻译 | 示例
           

摘要

The NEC3 ECC does not specifically define "risk". It is therefore defined in accordance with the common usage of the term, namely "danger", "possibility of loss, injury or other adverse situation" or "the possibility of commercial loss". The ECC does, however, define a "Risk Register" (Clause 11.2(14)) as a register of risks which are either:rn1. listed in the Contract Data by either the Employer or the Contractor immediately prior to the formation of the contract or.
机译:NEC3 ECC没有特别定义“风险”。因此,它是根据术语的常见用法来定义的,即“危险”,“损失,伤害或其他不利情况的可能性”或“商业损失的可能性”。但是,ECC确实定义了“风险登记册”(第11.2(14)条)作为以下风险登记册:rn1。雇主或承包商在合同成立之前立即将其列在合同数据中,或者。

著录项

  • 来源
    《Civil Eengineering》 |2010年第1期|31-32|共2页
  • 作者

    Ron Watermeyer;

  • 作者单位
  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号