【24h】

Roda Test

机译:罗达测试

获取原文
获取原文并翻译 | 示例
           

摘要

Several heavyweight tractor-trailer rigs are about to set out on a two-year journey confined to a 1.8 mile oval test track in Alabama. The accelerated loading tests should help state departments of transportation improve asphalt pavement performance nationwide. Most test tracks are built to test vehicles, but one now under construction near Auburn, Alabama, has been designed for testing pavement, specifically hot-mix asphalt. The National Center for Asphalt Technology (NCAT) at Auburn University is spending $7.5 million to construct a 1.8 mi (2.9 km) oval track that will test pavement designs submitted by nine states and the Federal Highway Administration (FHWA). The different asphalt designs, which are being constructed according to each state's specifications, will be subjected to accelerated loading over a two-year period and analyzed for performance.
机译:数年的重型拖挂式钻机将在阿拉巴马州一个长达1.8英里的椭圆形试验跑道上进行为期两年的旅程。加速载荷试验应有助于国家交通部门改善全国沥青路面的性能。大多数测试轨道都是为了测试车辆而建造的,但是阿拉巴马州奥本附近的一条正在建设中的轨道已经设计用于测试路面,特别是热混合沥青。奥本大学国家沥青技术中心(NCAT)斥资750万美元建造了一条1.8英里(2.9公里)的椭圆形轨道,该轨道将测试9个州和联邦公路管理局(FHWA)提交的路面设计。根据每个州的规范建造的不同沥青设计将在两年内承受加速荷载,并进行性能分析。

著录项

  • 来源
    《Civil Engineering》 |2000年第6期|p.50-55|共6页
  • 作者

    Brian Fortner;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号