首页> 外文期刊>Civil Engineering >GE's PCB Remediation Plan Features Innovative Tunnel Design
【24h】

GE's PCB Remediation Plan Features Innovative Tunnel Design

机译:GE的PCB修复计划采用创新的隧道设计

获取原文
获取原文并翻译 | 示例
           

摘要

Engineers at General Electric (GE) charged with remov-ing polychlorinated biphenyls (PCBS) from the Hudson River and its riverbed have developed a unique tunneling solution. Those engineers will quite literally be working from the ground up, as a pair of 925 ft (282 m) long tunnels expressly designed to capture PCBS will be bored approximately 60 ft (18.3 m) beneath the riverbed through the shale bedrock. A network of drains extending vertically and horizontally from the tunnels will collect PCB-tainted water that has seeped into the bedrock under the riverbed, and a pumping system will convey the contaminated water to GE'S riverside treatment plant, which will be expanded as part of the project.
机译:负责从哈德逊河及其河床中清除多氯联苯(PCBS)的通用电气(GE)的工程师已经开发出独特的隧道解决方案。这些工程师实际上将完全从头开始工作,因为一条专门设计用来捕获PCBS的925英尺(282 m)长的隧道将通过页岩基岩在河床下钻大约60英尺(18.3 m)。从隧道垂直和水平延伸的排水管网将收集多氯联苯污染的水,这些水已渗透到河床下方的基岩中,而抽水系统会将受污染的水输送到GE的河滨处理厂,该厂将作为污水处理厂的一部分进行扩展项目。

著录项

  • 来源
    《Civil Engineering》 |2004年第6期|p.15|共1页
  • 作者

    Jessica Binns;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号