首页> 外文期刊>Civil Engineering >Government Found Liable for Dejays in Design/Build Project
【24h】

Government Found Liable for Dejays in Design/Build Project

机译:政府发现设计/建造项目中的违约责任

获取原文
获取原文并翻译 | 示例
           

摘要

Under the fast-track design/build method of project delivery, construction may start on those portions of the work for which the design is complete while other portions are still being designed. For owners, the advantages of a fast-track approach can include less time for project completion, potentially lower construction costs, and a single point of responsibility. Fast-track projects can hit snags along the way, however, if the requisite project approvals prove burdensome or time consuming, the flow of information between the parties is less than optimal, or the project management lacks experience or manpower.
机译:在项目交付的快速设计/构建方法下,可以在完成设计的工作的那些部分上开始构建,而其他部分仍在设计中。对于业主而言,快速跟踪方法的优点包括更少的项目完成时间,潜在的更低的建设成本以及单一的责任点。快速通道项目可能会遇到麻烦,但是,如果必需的项目批准证明负担重或耗时,各方之间的信息流不是最优的,或者项目管理人员缺乏经验或人力。

著录项

  • 来源
    《Civil Engineering》 |2009年第9期|96|共1页
  • 作者单位

    Capital Project Strategies, LLC, Reston, Virginia;

    Briglia McLaughlin, PLLC, Vienna, Virginia;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号