首页> 外文期刊>Civil Engineering >Strengthening, rehabilitation and widening of the existing arch bridge on National Route 7 over the Olifants River
【24h】

Strengthening, rehabilitation and widening of the existing arch bridge on National Route 7 over the Olifants River

机译:加强,修复和扩建Olifants河上7号国道上的现有拱桥

获取原文
获取原文并翻译 | 示例
       

摘要

The existing arch bridge over the Olifants River presented various defects, including extensive cracking in various parts of the structure, spall damage and expansion joint failure. Innovative methods were employed for repair, including large areas of carbon fibre wrapping, and a novel method of widening the existing deck. Through the use of concrete material specialists and experienced specialist contractors it was possible to meet the client's requirements of extending the service life of the structure.
机译:现有的Olifants河上的拱桥存在各种缺陷,包括结构各部分的大量开裂,剥落破坏和伸缩缝破坏。采用了创新的维修方法,包括大面积的碳纤维包裹,以及一种拓宽现有甲板的新颖方法。通过使用混凝土材料专家和经验丰富的专业承包商,可以满足客户延长结构使用寿命的要求。

著录项

  • 来源
    《Civil Engineering》 |2019年第2期|19-26|共8页
  • 作者单位

    Aurecon South Africa (Pty) Ltd Adjunct Senior Lecturer, Civil Engineering Stellenbosch University;

    Aurecon South Africa (Pty) Ltd;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 04:15:09

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号