...
首页> 外文期刊>Chinese Journal of Mechanical Engineering >Modified bottleneck-based procedure for large-scale flow-shop scheduling problems with bottleneck
【24h】

Modified bottleneck-based procedure for large-scale flow-shop scheduling problems with bottleneck

机译:带有瓶颈的大规模流水车间调度问题的基于瓶颈的改进过程

获取原文
获取原文并翻译 | 示例
           

摘要

A new bottleneck-based heuristic for large-scale flow-shop scheduling problems with a bottleneck is proposed, which is simpler but more tailored than the shifting bottleneck (SB) procedure. In this algorithm, a schedule for the bottleneck machine is first constructed optimally and then the non-bottleneck machines are scheduled around the bottleneck schedule by some effective dispatching rules. Computational results show that the modified bottleneck-based procedure can achieve a tradeoff between solution quality and computational time comparing with SB procedure for medium-size problems. Furthermore it can obtain a good solution in quite short time for large-scale scheduling problems.
机译:提出了一种新的基于瓶颈的启发式方法,用于解决带有瓶颈的大规模流水车间调度问题,该方法比转移瓶颈(SB)过程更简单,但更具针对性。在该算法中,首先优化构造瓶颈机器的调度程序,然后通过一些有效的调度规则围绕瓶颈调度表调度非瓶颈机器。计算结果表明,与中等规模问题的SB方法相比,基于瓶颈的改进程序可以在解决方案质量和计算时间之间取得折衷。此外,它可以在很短的时间内针对大规模调度问题获得良好的解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号