首页> 外文期刊>CERN courier >First phase of BEPCII complete
【24h】

First phase of BEPCII complete

机译:BEPCII第一阶段完成

获取原文
获取原文并翻译 | 示例
           

摘要

The first phase of commissioning BEPCII, the major upgrade of the Beijing Electron-Positron Collider (BEPC) came to a successful conclusion on 3 August, when the beam current reached 500 mA at 1.89 GeV. On the same day the researchers also completed mapping the combined magnetic field of the superconducting insertion magnets (SCQs) and the superconducting solenoid of the detector BESIII. This followed a series of studies that included the first collisions between beams in the electron and positron rings. The successful commissioning of the superconducting magnets and the cryogenics demonstrated that both systems were stable and up to design performance.
机译:BEPCII调试的第一阶段,即北京电子正电子对撞机(BEPC)的重大升级,于8月3日成功完成,当时电子束电流在1.89 GeV时达到500 mA。在同一天,研究人员还完成了对超导插入磁体(SCQ)和探测器BESIII的超导螺线管的组合磁场的映射。随后进行了一系列研究,其中包括电子环和正电子环中电子束之间的首次碰撞。超导磁体和低温装置的成功调试表明,这两个系统都稳定且达到设计性能。

著录项

  • 来源
    《CERN courier》 |2007年第8期|5|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 原子能技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号