Within the framework of a modernization project at Wossingen cement plant, a new preheater tower and clinker cooler was constructed without interrupting plant operation. During a plant stoppage in spring 2009, this will be connected up to the existing infrastructure and put into operation. In order to keep the conveying distances between the new kiln line and the existing plant sections as short as possible, the new line had to be built close to the existing kiln. The confined space conditions demanded a somewhat unconventional approach to the construction work sequence.
机译:在Wossingen水泥厂的现代化项目框架内,在不中断工厂运行的情况下建造了新的预热塔和熟料冷却器。在2009年春季工厂停产期间,这将连接到现有基础设施并投入运行。为了使新窑生产线与现有工厂段之间的输送距离尽可能短,新生产线必须在现有窑附近建造。在狭窄的空间条件下,要求采用某种非常规的方法来进行施工。

著录项

  • 来源
    《ZKG International》 |2009年第3期|24-2628|共4页
  • 作者

    Joerg Hammeridi;

  • 作者单位

    IKN GmbH, XcHstiidt/ Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:21:03

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号