首页> 外文期刊>ZKG International >The ProDOK I&C CAE system
【24h】

The ProDOK I&C CAE system

机译:ProDOK I&C CAE系统

获取原文
获取原文并翻译 | 示例
       

摘要

Modern process-engineering plants can be effectively and efficiently operated only provided the data from the planning phase are also available for operation, maintenance and modernisation. Plant reality ("as-built status") and documentation must accord at all times. Cost-intensive repeat entries and unnecessary engineering hours can be avoided only provided all the data are consistent. This is precisely where the ProDOK I&C CAE system comes in, assuring an integrated planning process on the basis of uniform rules. There are no problems with annoying data-transfer errors, because all the data is obtained and interchanged within one system.
机译:仅在计划阶段的数据也可用于运营,维护和现代化的情况下,现代化的过程工程工厂才能得到有效而高效的运营。工厂现实(“已建状态”)和文档必须始终保持一致。仅在所有数据都一致的情况下,才可以避免成本高昂的重复输入和不必要的工程时间。这正是ProDOK I&C CAE系统出现的地方,可在统一规则的基础上确保集成的计划流程。烦人的数据传输错误没有任何问题,因为所有数据都是在一个系统中获得并交换的。

著录项

  • 来源
    《ZKG International》 |2013年第10期|25-25|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:20:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号