首页> 外文期刊>Cellular Business >Think before you build
【24h】

Think before you build

机译:建立之前请三思

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The process of acquiring and building cellular sites begins with an RF engineer who identifies potential point sources and appropriate antenna heights, and then develops ring maps. The RF engineer's sole criterion is to confirm a potential location's suitability as an effective transmission site. Selection of an appropriate site is a complex process, involving a host of engineering, legal, economic, environmental and public relations challenges. This is where effective teamwork among business development people, engineers, the construction contractor, an attorney and site-acquisition specialists can pay off in the long run. Careful planning, consideration of alternatives, selection of an appropriate contractor, teamwork and attention to details literally will enable service providers to send a strong signal to their customers.
机译:获取和建立蜂窝站点的过程始于RF工程师,RF工程师确定潜在的点源和合适的天线高度,然后开发环形图。 RF工程师的唯一标准是确认潜在位置是否适合作为有效的传输站点。选择合适的地点是一个复杂的过程,涉及许多工程,法律,经济,环境和公共关系方面的挑战。从长远来看,这是业务开发人员,工程师,建筑承包商,律师和现场采购专家之间有效的团队合作的回报。仔细的计划,考虑替代方案,选择合适的承包商,团队合作以及对细节的关注将使服务提供商能够向其客户发出强烈的信号。

著录项

  • 来源
    《Cellular Business》 |1997年第10期|p.34-37|共4页
  • 作者

    Charles S Costanzo;

  • 作者单位

    Costanzo is president oF EMCOR Telecom.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号