...
【24h】

Cleanup goes west

机译:清理工作向西

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

There's a subtle change to plans for the annual BCN Cleanup volunteer working party this year - it won't actually be on the Birmingham Canal Navigations at all! But despite this, the organisers hope that it will still fulfil its usual function of helping to keep the waterways of the West Midlands rubbish-free. Having mainly concentrated on the less-frequented routes of the northern BCN - such as the Walsall, Tame Valley and Wyrley & Essington (pictured) - in recent years, for 2013 the Cleanup shifts westwards to the Stourbridge Canal. Never historically part of the BCN, the Stourbridge is closely connected as one of the main routes onto the system via Delph, the Dudley Canal and Netherton Tunnel. Volunteers will be throwing their grappling hooks into the Stourbridge main line above Sixteen Locks and the dead-end Fens Branch which leads to an attractive but underused mooring site.
机译:今年的年度BCN清理志愿者工作组的计划有一个细微的变化-实际上它根本不会出现在伯明翰运河航行中!但是尽管如此,组织者还是希望它能继续履行其通常的功能,即帮助保持西米德兰兹郡的水道无垃圾。近年来,主要集中在北部BCN较不频繁的路线上,例如Walsall,Tame Valley和Wyrley&Essington(如图),在2013年,Cleanup向西转移至Stourbridge运河。从历史上讲,斯托布里奇从来都不是BCN的一部分,它是通过德尔夫(Delph),达德利运河(Dudley Canal)和纳瑟顿隧道(Netherton Tunnel)进入该系统的主要路线之一。志愿者将把钩钩扔到十六号锁上方的Stourbridge主线和尽头的Fens分支上,这导致了一个有吸引力但未充分利用的停泊地点。

著录项

  • 来源
    《Canal boat and inland waterways》 |2013年第4期|11-11|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号