...
【24h】

Going underground

机译:进入地下

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This is the inside of Netherton Tunnel as work progresses on major repairs to a section near the centre of the 3,022-yard tunnel. The work has been planned since the tunnel was identified over 18 months ago (see our feature, Sep 2011) as the only one on the network suffering from active movement. The sides were being pushed inwards by lateral pressure on the walls, resulting in the crown of the arch cracking. The repairs have involved excavating the twin towpaths and inserting two lines of five metre ground anchors on each side, one set to resist lateral movement and the other to provide vertical support, before reinstating the towpaths in concrete.
机译:这是Netherton隧道的内部,随着对3,022码隧道中心附近部分的重大维修工作的进行。自从该隧道在18个月前被确定(请参阅我们的功能,2011年9月)以来,已经计划了这项工作。侧面被壁上的侧向压力向内推,导致拱顶开裂。维修工作包括挖掘双牵引索道,并在每侧插入两行五米长的地锚,一组用于抵抗侧向运动,另一组提供垂直支撑,然后再将牵引道恢复为混凝土。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号