...
首页> 外文期刊>Canal boat and inland waterways >Boats through here in five years?
【24h】

Boats through here in five years?

机译:五年内通过这里的船只?

获取原文
获取原文并翻译 | 示例

摘要

One of two new bridges is seen taking shape as work continues on a project funded by Highways England to reinstate the Stroudwater Navigation's crossing of the A38 main road as part of the Cotswold Canals restoration. Paid for with a £4m grant from a pot of public money earmarked specifically for remediation of damage caused by earlier road construction work, the bridges will take the canal through the middle of the roundabout where the A38 meets the A419 near Eastington.
机译:随着由高速公路英国的高速公路资助的项目继续努力恢复A38主干道的一部分作为科茨沃尔德运河恢复的一部分,可以塑造两种新桥梁之一。支付400万英镑的公共货币批准专门用于修复早期的道路建设工作造成的损害,桥梁将通过环形交叉路口中间乘坐运河,其中A38符合Eastington附近的A419。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号