首页> 外文期刊>Canal boat and inland waterways >£45m winter works launched
【24h】

£45m winter works launched

机译:00 000万英镑的冬季工程推出

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Despite a 10 percent reduction in its income for the year, the Canal & River Trust has prioritised available cash on keeping a full winter maintenance and repair programme going, carrying out £45.1m worth of work on 50 waterways across England and Wales - an increase from £43.6m in winter 2019-20. The drop of £20m in CRT's total budget is largely due to reductions in income resulting from the impact of the coronavirus pandemic; even when the £10m saved by furloughing staff earlier this year is taken into consideration it still leaves the Trust with reduced funds available, and the programme has been slightly trimmed back from what had originally been planned.
机译:尽管今年收入减少了10%,但运河和河流信托已优先考虑保持全冬季维护和维修计划的可用现金,在英格兰和威尔士的50家水道上开展价值45.1亿英镑 - 增加2019 - 20年冬季的£43.6米。 CRT总预算中的20万英镑的跌幅主要是由于冠状病毒大流行影响所产生的收入;即使在今年早些时候汇票员工节省的10米,也考虑到它仍然让信任减少可用资金,并且该计划已从最初计划的内容略微修剪。

著录项

  • 来源
    《Canal boat and inland waterways》 |2020年第11期|6-6|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号