首页> 外文期刊>Canal boat and inland waterways >PUMP FAILURE HITS K&A SUMMIT
【24h】

PUMP FAILURE HITS K&A SUMMIT

机译:泵故障击中K&A峰会

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Problems with pumps have meant that the locks either side of the Kennet & Avon Canal's summit level have been reduced to two days' operation per week pending repairs, The canal's short summit has always relied on pumping to keep it topped up. In working days this involved Crof ton steam pumping station (now restored), but today electric pumps either side of the summit do the job on a daily basis, However they rely on there being enough water to supply them from the Long Pound from Wootton Rivers to Devizes, which in turn requires the Devizes pumps to raise water past the 29-lock Caen Hill flight. When one of these failed and needed to be sent away for repair, the remaining pump was insufficient to keep up with demand, even after it had been lifted for clearance of debris.
机译:泵的问题意味着Kennet&Avon Canal的峰值级别的锁定了两天的每周待定修理的两天操作,运河的短峰会始终依靠抽水以保持其膨胀。在工作日内,这涉及CROF TON蒸汽泵站(现在恢复),但今天峰会的两侧每天都会做这项工作,但他们依靠足够的水来供应来自Wootton Rivers的长英镑为了脱颖而出,这反过来需要偏离泵将水饲养过去29锁Caen Hill飞行。当其中一个失败并需要被送去维修时,即使在被抬起以供碎片清除后,剩余的泵也不足以跟上需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号