...
首页> 外文期刊>Canal boat and inland waterways >Toddbrook initial work under way
【24h】

Toddbrook initial work under way

机译:托德布鲁克的初步工作正在进行中

获取原文
获取原文并翻译 | 示例

摘要

With the results of the investigation into the reasons for last summer's failure at the Peak Forest Canal's Toddbrook Reservoir expected "within weeks", initial works aimed at putting the reservoir back into use are already under way. The dam's auxiliary spillway, intended to carry away surplus water after abnormal rainfall, suffered severe damage to its concrete surface while carrying out this function following a very heavy downpour, despite an independent inspector having given the reservoir a clean bill of health only months earlier. Both a Canal & River Trust study and an external investigation are expected to report shortly.
机译:预期“数周内”对山顶森林运河的托德布鲁克水库的去年夏天失败的原因进行调查的结果,旨在使水库重新投入使用的初步工作已经在进行中。大坝的辅助溢洪道原本打算在异常降雨后带走多余的水,但在倾盆大雨之后,混凝土表面受到严重破坏,同时履行了这一职能,尽管独立检查员仅在几个月前就给水库提供了清洁的卫生单。预计Canal&River Trust研究和外部调查都将在短期内报告。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号