...
首页> 外文期刊>Canal boat and inland waterways >CARNIVAL TO MARK SCOTTISH REOPENING
【24h】

CARNIVAL TO MARK SCOTTISH REOPENING

机译:嘉年华纪念苏格兰重新开放

获取原文
获取原文并翻译 | 示例
           

摘要

The completion of repairs following two liftbridge failures in 2018 on the Forth & Clyde Canal will be marked by a floating festival to celebrate the reopening of the coast-to-coast route in May.Last year was not a good year for Scotland's Lowland canals. Not only did Scottish Canals take the power-operated road bridges at Twechar and Bonnybridge out of use on safety grounds, but further problems hit Leamington Liftbridge on the Union Canal in Edinburgh and other sites. And an asset management study came up with the stark conclusion that parts of the Lowland system (only reopened after restoration in 2002) faced permanent closure as the backlog of engineering work mounted.
机译:继2018年在Forth&Clyde运河上发生两次吊桥故障之后,维修工作的完成将以庆祝5月重新开放沿海到沿海航线的浮动节日为标志。去年对于苏格兰的低地运河来说不是好年。苏格兰运河不仅出于安全原因使Twechar和Bonnybridge的动力桥不再使用,而且进一步的问题袭击了位于爱丁堡和其他地点的联合运河上的Leamington Liftbridge。一项资产管理研究得出了一个鲜明的结论,即随着工程工作的积压,Lowland系统的某些部分(仅在2002年恢复后才重新开放)面临永久关闭。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号