...
首页> 外文期刊>Canadian Environmental Law Reports >Yellowknives Dene First Nation v. Canada (Minister of Aboriginal Affairs and Northern Development)
【24h】

Yellowknives Dene First Nation v. Canada (Minister of Aboriginal Affairs and Northern Development)

机译:耶洛奈夫斯·丹恩第一民族诉加拿大(原住民和北部发展部部长)

获取原文
获取原文并翻译 | 示例

摘要

Natural resources-Mines and minerals - Practice and procedure - Miscellaneous-Environmental Impact Review Board concluded, pursuant to s. 128(1)(a) of Mackenzie Valley Resource Management Act, that proposed diamond exploration project was not likely to have any significant adverse impact on environment or to be cause of significant public concern - As result, board concluded that environmental impact review of project was not necessary and that it should proceed to regulatory phase for permitting and licensing -Applicant First Nation brought application seeking to set aside decision of board - Application dismissed - Board provided justification for its decision - Its decision and reasons it provided with respect to two located and eight not-as-yet located drill-holes were transparent and intelligible - Given unique characteristics of project, it was not unreasonable for board to find that there was unlikely to be significant adverse impact on environment or cause of significant public concern as consequence of eight of possible future drill holes not yet being identified by developer - Board's decision respecting cumulative impact was reasonable - Duty to consult in this case was on mid-range of spectrum because of low adverse impact of project - Consultation process provided under Act adequately met Crown's duty to consult and accommodate in this case - Concerns of applicant were taken into account by board, which made decision on very small scale project within sensitive area.
机译:自然资源-矿产和矿物-实践和程序-杂项-环境影响评估委员会根据s的规定成立。 Mackenzie Valley资源管理法第128(1)(a)条建议的钻石勘探项目不太可能对环境造成任何重大不利影响,也不会引起公众的广泛关注-结果,委员会得出结论认为,该项目的环境影响审查是没有必要的,应该进入许可和许可的监管阶段-申请人的原住民提出申请,要求搁置董事会的决定-申请被驳回-董事会提供了其决定的理由-关于两个所在地的决定和理由并且八个尚未定位的钻孔是透明且可理解的-鉴于项目的独特特征,董事会认为对环境的不利影响或引起公众广泛关注的可能性不大可能是合理的开发人员尚未识别出的八个未来可能发生的钻孔-董事会关于累计的决定积极的影响是合理的-由于项目的不利影响较小,在这种情况下的咨询义务处于频谱的中间范围-根据法案提供的咨询程序充分满足了Crown在这种情况下的咨询和适应的义务-考虑了申请人的担忧董事会决定对敏感区域内的小规模项目做出决定。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号