首页> 外文期刊>California management review >Innovation in Megaprojects: Systems Integration at London Heathrow Terminal 5
【24h】

Innovation in Megaprojects: Systems Integration at London Heathrow Terminal 5

机译:大型项目中的创新:伦敦希思罗机场5号航站楼的系统集成

获取原文
获取原文并翻译 | 示例
       

摘要

Megaprojects require investment of $lbn or more to build infrastructure, usually involving a complex system of production consisting of discrete, routine, and high-volume repetitive processes. Many of these processes can be progressively standardized and replicated to improve overall productive performance. This article presents the findings of research on design and production of London's Heathrow Airport Terminal 5 (T5). The findings were used to develop a conceptual framework-which we call the systems integration model-to identify the project and operational processes that contribute to success in delivering megaprojects. The systems integrator is the lead organization in a megaproject, responsible for establishing a governance structure, managing risk, and coordinating processes performed by a large network of external suppliers. Innovations based on the "recombination" and "replication" of processes can be introduced to improve megaproject performance.
机译:大型项目需要投资1亿美元或更多才能建立基础设施,通常涉及复杂的生产系统,该生产系统由离散,常规和大批量重复过程组成。这些过程中的许多过程都可以逐步标准化和复制,以提高整体生产性能。本文介绍了伦敦希思罗机场5号航站楼(T5)的设计和生产研究成果。这些发现被用于开发概念框架(我们称为系统集成模型)来识别有助于成功交付大型项目的项目和运营流程。系统集成商是大型项目中的牵头组织,负责建立治理结构,管理风险以及协调由大型外部供应商网络执行的流程。可以引入基于过程的“重组”和“复制”的创新,以提高大型项目的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号