...
首页> 外文期刊>Bulletin of the Seismological Society of America >Development of Ground-Motion Prediction Equations Relevant to Shallow Mining-Induced Seismicity in the Trail Mountain Area, Emery County, Utah
【24h】

Development of Ground-Motion Prediction Equations Relevant to Shallow Mining-Induced Seismicity in the Trail Mountain Area, Emery County, Utah

机译:与犹他州埃默里县步道山区浅层地震诱发地震有关的地震动预测方程的开发

获取原文
获取原文并翻译 | 示例
           

摘要

To provide a basis for assessing the seismic hazard to the Joes Valley Dam due to future coal mining in the nearby Cottonwood Tract, central Utah, we developed ground-motion prediction relations using data recorded by a seismic network, established and operated by the University of Utah Seismograph Stations. The network was centered on the Trail Mountain coal mine, located adjacent to the Cottonwood Tract. From late 2000 until early 2001, this network recorded numerous mining-induced events with magnitudes as large as 2.17. The ground motion from these events, recorded at hypocentral distances ranging from about 500 m to approximately 10 km, were well suited to developing new ground-motion prediction relations, especially when augmented by data from a M 4.2 earthquake in the Willow Creek mine, about 50 km north of Trail Mountain. Using a two-stage regression analysis, we determined prediction relations for peak acceleration, peak velocity, and pseudovelocity response spectra, at 5% damping, for periods of 0.1, 0.2, 0.5, 1.0, and 2.0 s. To illustrate the potential seismic hazard at the Joes Valley dam, we used these ground-motion relations to predict a peak velocity of 6.8 cm/s due to an earthquake with the probable maximum magnitude of 3.9, at a hypocentral distance of 1 km, recorded at a rock site typical for this region. This result does not take into account the site response at the dam.
机译:为评估犹他州中部附近的三角叶杨附近的未来煤矿开采对乔斯谷大坝造成的地震危险,我们开发了地震动预测关系< sup> 使用由犹他大学地震台站建立并运行的地震网络记录的数据。网络 集中在Trail Mountain煤矿,位于卡顿伍德地区的 附近。从2000年下半年到2001年初,这个 网络记录了许多矿山诱发的事件,其大小 高达2.17。这些事件的地面运动记录在距震中心约500 m到大约 10 km的距中心距离 ,非常适合开发新的地面运动预测 关系,尤其是在来自Trail Mountain以北约50公里的Willow Creek矿山发生的M 4.2地震 的数据增强的情况下。 使用两阶段回归分析,我们确定了峰值加速度,峰值速度和伪速度响应谱的预测关系 ,阻尼为5%时的0.1s,0.2、0.5、1.0和2.0 s的 为了说明乔斯谷地(sups )大坝的潜在地震危险,我们使用这些地面运动关系预测了6.8 cm / s的峰值速度。由于地震发生,最大震级可能为 3.9,在距震中心1 km处, 记录在该地区典型的岩石场所。此结果 未考虑大坝处的现场响应。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号