首页> 外文期刊>Bulletin of engineering geology and the environment >Engineering geological evaluation of reconstruction sites following the Wenchuan earthquake
【24h】

Engineering geological evaluation of reconstruction sites following the Wenchuan earthquake

机译:汶川地震后重建场址的工程地质评价

获取原文
获取原文并翻译 | 示例
       

摘要

Site selection and risk assessment are extremely important aspects of the post-earthquake reconstruction of damaged towns. The main principles applied in this process were the towns located on/adjacent to the fault with a fragile geology would be relocated; heavily damaged towns some distance from the fault but without landslides/ debris flows/significant slope movement would be reconstructed at their original location following strict construction codes. During the process of post-earthquake reconstruction, particular attention should be paid to hidden geological hazards, the variety and interdependency of risk-inducing factors and to long-term safety, etc. The paper discusses the site selection process for the reconstruction of Beichuan City, Qingchuan City and Muyu Town.
机译:选址和风险评估是灾后重建受损城镇的极为重要的方面。此过程中应用的主要原则是,将迁移位于断层上/附近且地质脆弱的城镇;距断层一定距离但没有滑坡/泥石流/明显斜坡移动的严重受损城镇,将按照严格的施工规范在其原始位置进行重建。在地震灾后重建过程中,应特别注意隐患的地质灾害,危险因素的种类和相互依赖性以及长期安全性等。本文讨论了北川市重建的选址过程。 ,青川市和木鱼镇。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号