首页> 外文期刊>Bulletin of engineering geology and the environment >Improving geological models of projects by risk management: then Ponserand tunnel
【24h】

Improving geological models of projects by risk management: then Ponserand tunnel

机译:通过风险管理改善项目的地质模型:然后是Ponserand隧道

获取原文
获取原文并翻译 | 示例
       

摘要

The tunnel project of Ponserand (Aigueblanche, Savoie, France) includes several variants. The longer ones go across the mountain with good geological conditions whereas the latter one goes between the national road RN90 and the existing tunnel. The latter variant cuts across scree slopes that represent unfavorable geological conditions. Thus costs of the longer variants are better estimated than the ones for the shorter alignment alternative. In order to choose the right variant, a risk manageme
机译:Ponserand(法国萨瓦省艾格布兰奇)的隧道项目包括多个变体。较长的路段穿过具有良好地质条件的山峰,而较长的路段穿过RN90国道与现有隧道之间。后一种变体在代表不利地质条件的卵石坡度上切割。因此,与较短的比对方案相比,可以更好地估算较长的变异体的成本。为了选择正确的变体,风险管理

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号