...
首页> 外文期刊>Bulk materials international >Camrail set for more mining demand
【24h】

Camrail set for more mining demand

机译:Camrail有望满足更多采矿需求

获取原文
获取原文并翻译 | 示例

摘要

Moto Engil Africa has reported that the existing railway between Ngaoundere and the Port of Douala in Cameroon can support bauxite transport from the Minim Martap mine. It undertook an investigation on behalf of Camalco, the local offshoot of Australia's Canyon Resources, which plans to develop the mine. The line, which is operated by Camrail and passes the Edea aluminium plant on its way to Douala, is currently being upgraded. The company has yet to reveal its expected export volumes, but Cameroon is believed to have the second biggest bauxite reserves in Africa after Guinea.
机译:Moto Engil Africa报道说,Ngaoundere和喀麦隆杜阿拉港口之间的现有铁路可以支持Minim Martap矿山的铝土矿运输。它代表澳大利亚峡谷资源的当地分支Camalco进行了调查,该公司计划开发该矿。该生产线目前由Camrail运营,经过Edea铝厂前往杜阿拉,目前正在升级。该公司尚未透露其预期的出口量,但据信喀麦隆的非洲铝土矿储量仅次于几内亚。

著录项

  • 来源
    《Bulk materials international》 |2019年第mayajuna期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号