...
首页> 外文期刊>Bulk materials international >Fortescue hits the accelerator
【24h】

Fortescue hits the accelerator

机译:Fortescue击中了加速器

获取原文
获取原文并翻译 | 示例

摘要

Fortescue Metals Group (FMG) is pushing ahead with stage two of its Iron Bridge magnetite concentrate project in Western Australia's Pilbara, targeting 22 Mtpa of high-grade 67% product by 2023. Subsidiary FMG Magnetite (in effect 88% FMG and 12% Baosteel) and joint-venture partner Formosa Steel have already completed the US$0.5B stage one con-struction of large-scale pilot and demonstration plants that have validated key equipment and magnetite production processes, and announced the move to ramp up the full US$2.6B project on 2 April.
机译:Fortescue Metals Group(FMG)正在推进其在西澳大利亚州Pilbara的Iron Bridge磁铁矿精矿项目的第二阶段,目标是到2023年使22 Mtpa的高品位67%产品成为目标。附属FMG磁铁矿(实际上为88%FMG和12%宝钢) )和合资伙伴福尔摩沙钢铁公司(Formosa Steel)已完成规模为US $ 0.5B的大型中试工厂和示范工厂的第一阶段建设,该工厂已验证了关键设备和磁铁矿生产工艺,并宣布将逐步提高全部US $ 2.6B项目于4月2日开始。

著录项

  • 来源
    《Bulk materials international》 |2019年第maraaapra期|2-2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号