首页> 外文期刊>Buildings >Pre-Installation Tips
【24h】

Pre-Installation Tips

机译:安装前提示

获取原文
获取原文并翻译 | 示例
       

摘要

Follow these tips from Vancouver, BGbased BuildDirect before installing your laminate floor:rn1. Ensure that your subfioor is flat, dry, and smooth. Laminate flooring and the underlayment/vapor barrier can be installed over concrete, wood flooring, vinyl tile, linoleum, or almost any other hard, flat surface.rn2. Always use underiayment under your laminate floor for soundproofing.rn3. Take extra care when installing laminate flooring over radiant heating. Ensure that you read the instructions carefully before beginning.rn4. Allow your laminate flooring to acclimate to the room in which it will be installed for as long as possible (a minimum of 48 hours).rn5. Inspect each laminate flooring panel carefully for defects or damage before installing it.
机译:在安装强化地板之前,请遵循来自温哥华,基于BG的BuildDirect的这些提示:rn1。确保您的下地板平整,干燥且光滑。强化地板和衬里/防潮层可以安装在混凝土,木地板,乙烯基瓷砖,油毡或几乎任何其他坚硬的平坦表面上。始终在层压地板下面使用防渗漏措施以隔音。通过辐射加热安装强化地板时,请格外小心。开始之前,请确保已仔细阅读说明。让您的强化地板在尽可能长的时间内适应安装该地板的房间(至少48小时)。在安装前,请仔细检查每个强化地板的缺陷或损坏。

著录项

  • 来源
    《Buildings》 |2009年第4期|32-32|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:55:20

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号