首页> 外文期刊>Buildings >Comparative Building Costs
【24h】

Comparative Building Costs

机译:比较建筑成本

获取原文
获取原文并翻译 | 示例
       

摘要

This 16,000-square-foot facility has 15 units for military veterans. Design documents were developed from start to finish in five months in order to meet expiring funding deadlines. However, after design had begun, the site was found to consist of 70% wetlands, a discovery that necessitated a multi-building solution and more roadway costs. To cover the additional site development costs as well as hyperinflation on some construction materials, two rounds of value engineering were needed. The completed project consists of four buildings with a mixture of 3- and 5-unit, one-story groupings and a fifth building with a community center and manager's residence.
机译:这个16,000平方英尺的工厂有15个退伍军人单位。从头到尾在五个月内制定了设计文件,以期达到到期的资金截止日期。但是,在开始设计后,发现该场地由70%的湿地组成,这一发现需要多重建筑解决方案和更多的道路成本。为了支付额外的场地开发成本以及某些建筑材料的恶性通货膨胀,需要进行两轮价值工程。已完成的项目由四栋建筑组成,这些建筑包含3单元和5单元的组合,一层为一个楼层,第五栋建筑则具有社区中心和经理住所。

著录项

  • 来源
    《Buildings》 |2015年第2期|50-50|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:54:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号