Judge thornton explained three useful points in the case of Westminster Building Company vs Andrew Beckingham. Before we go any further, hark the round of applause to the adjudicator Mr Bob Ames. You were spot on, my boy. None of the three points were easy. All of them were to do with the law and this RICS non-lawyer fellow goes top of the class. The story is about Mr Beckingham spending a quarter of a million pounds on refurbishing his mid-terrace town house. No mean sum. The contractual bumf proposed by Mr Beckingham's team included the JCT Intermediate Form. That's spot on as well. For one reason or another the contractual completion date ran away. So the parties signed up a capping agreement at about month eight. Then there was a row about what it meant. Westminster now said it was underpaid. So the adjudicator did his 28-day rain-dance and obliged Mr Beckingham to pay up. When Mr Beckingham stalled, Westminster sued.
机译:桑顿法官解释了在威斯敏斯特建筑公司与安德鲁·贝克汉姆案中的三个要点。在我们进一步行动之前,请陪审团成员鲍勃·艾姆斯(Bob Ames)鼓掌。你发现了,我的孩子。这三点都不容易。所有这些都与法律有关,而这位RICS非律师同伴位居全班之首。这个故事是关于贝克汉姆先生花费25万英镑翻新他的中层露台别墅的故事。没有平均值。 Beckingham先生的团队提议的合同条款包括JCT中级表格。那也是现场。由于一个或另一个原因,合同完成日期已经过去了。因此,双方在大约第八个月签署了封顶协议。然后有一个关于它的含义的争论。威斯敏斯特现在表示已被少付。因此,审裁官做了28天的雨舞,并要求贝克汉姆先生偿还债务。当贝克汉姆先生失速时,威斯敏斯特州起诉。

著录项

  • 来源
    《Building》 |2004年第8325期|p.57|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:39:54

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号