首页> 外文期刊>Building >FAST RELIEF FOR ACHES AND PAINS
【24h】

FAST RELIEF FOR ACHES AND PAINS

机译:快速缓解疼痛

获取原文
获取原文并翻译 | 示例
       

摘要

The Centre for Effective Dispute Resolution, you and I know it as GEDR, is one of the leading mediator appointing bodies. I remember going to its inaugural meeting back in 1990. And truth to tell, CEDR got mediation firmly embedded in the dispute-solving portfolio. Then, 10 years ago, it also became an adjudicator-nominating body. It is about to innovate again. "CEDR-Solve" has bolted adjudication and mediation together. It is standard 28-day adjudication in accordance with the Construction Act plus optional provisions for mediation. Call it Adj-Med. And from my own experience, it works well. I have even done arbitration then bolted on mediation; call that Arb-Med. Now, some of you will have heard of Med-Arb. Don't get that confused with what CEDR -Solve has come up with here. This is not where a failed mediation allows the mediator to impose a binding decision on the parties. This time it's the other way around. Let me explain. You are entitled under the Construction Act to bring your commercial dispute to an adjudicator. The adjudicator does the business and, at high speed to a strict timetable, produces the award.
机译:您和我都知道,有效争议解决中心(简称GEDR)是任命调解员的领先机构之一。我记得1990年曾参加过成立大会。说实话,CEDR已将调解牢牢地融入了解决争端的业务中。然后,在10年前,它也成为了提名评审员的机构。它即将再次创新。 “ CEDR-Solve”将裁决和调解结合在一起。根据《建筑法》加上调解的可选条款,这是标准的28天裁决。称之为Adj-Med。从我自己的经验来看,它效果很好。我什至已经完成了仲裁,然后进行了调停。叫那个Arb-Med。现在,你们中有些人会听说过Med-Arb。不要将它与CEDR -Solve弄混了。在这种情况下,调解失败会使调解员对双方施加具有约束力的决定。这次是另一回事了。让我解释。根据《建筑法》,您有权将您的商业纠纷带给裁决人。仲裁员开展业务,并在严格的时间表内高速做出裁决。

著录项

  • 来源
    《Building》 |2008年第36期|p.82-83|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

  • 入库时间 2022-08-18 00:37:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号