首页> 外文期刊>Building >Procure 21+ swamped by applications
【24h】

Procure 21+ swamped by applications

机译:购买超过21个应用程序

获取原文
获取原文并翻译 | 示例
       

摘要

The NHS has delayed shortlisting firms firms for its Procure 21+ framework after being swamped with applications. This will mean that the tender period for the replacement to Procure 21 will be extended over Christmas.rnPrequalification questionnaires for Procure 21+ were submitted on 17 September and should have been evaluated by the 29th in time for a shortlist to be announced on 22 October. But the Department of Health said it had received "a very healthy response" and would not be presenting a shortlist until 11 November.
机译:NHS在大量申请之后,推迟了其Procure 21+框架的入围公司名单。这意味着将替换Procure 21的招标期将在圣诞节期间延长。rnProcure 21+的资格预审调查表已于9月17日提交,应在29日之前进行评估,以便于10月22日公布入围名单。但是卫生部表示,它已经收到“非常健康的答复”,并且直到11月11日才会提出入围名单。

著录项

  • 来源
    《Building》 |2009年第38期|13|共1页
  • 作者

    Sophie Griffiths;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:36:38

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号