首页> 外文期刊>Building >£160m diverted to ODA
【24h】

£160m diverted to ODA

机译:1.6亿英镑转用于官方发展援助

获取原文
获取原文并翻译 | 示例
       

摘要

The Olympic Delivery Authority is to be given up to £160m from other parts of the Games' £9.3bn budget to pay for operating the venues in advance of the Games. The money will pay for venue security, test events and operating venues for elite athlete training. The cost, which has not been raised before, follows Building's report in September that the ODA was wrangling with other bodies, including the London Organising Committee ofrnthe Olympic Games and the Met, over the cost of managing the park before the event, partly because construction was on course to finish early.
机译:奥运会交付管理局将从奥运会其他预算中的93亿英镑中拨出1.6亿英镑,以支付奥运会前场地的运营费用。这笔钱将用于支付场地安全,测试赛事和运营场地的精英运动员训练费用。该费用之前未曾提出过,此前Building在9月份的报告中称,官方发展援助与其他机构(包括伦敦奥林匹克运动会和大都会组织)在会前管理公园的成本有关。早日完成。

著录项

  • 来源
    《Building》 |2010年第6期|12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:35:47

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号