首页> 外文期刊>Building >IN AT THE DEEP END
【24h】

IN AT THE DEEP END

机译:在深处

获取原文
获取原文并翻译 | 示例
       

摘要

Idon't think we have had a case previously that asked whether a collateral contract is a construction contract and can be adjudicated? It has cropped up in a dispute about the Cardiff International Swimming Pool. Laing O'Rourke Wales & West Ltd was the contractor under the familiar JCT Design & Build main contract. These "collateral contracts" are sort of bolt-on goodies, which bolt on all sorts of firms and folk and promises into the main contract. Laing O'Rourke happily agreed all the usual promises to the employer and then happily made all the same promises in a collateral contract to five other organisations with an interest in the swimming pool. One of the five is Parkwood Leisure Ltd, being the facilities manager for the completed building once built and up and running.
机译:我认为以前没有一个案例问过抵押合同是否是建筑合同并且可以裁定吗?它在关于加的夫国际游泳池的争执中浮出水面。 Laing O'Rourke Wales&West Ltd是众所周知的JCT Design&Build主合同的承包商。这些“抵押合同”是一种附带条件的商品,它们附加在各种公司和民间团体上,并承诺成为主要合同。 Laing O'Rourke高兴地同意了对雇主的所有通常承诺,然后高兴地在抵押合同中对与游泳池有兴趣的其他五个组织做出了同样的承诺。五个公园之一是Parkwood Leisure Ltd,一旦建成并投入运行,便是该建筑物的设施经理。

著录项

  • 来源
    《Building》 |2013年第40期|42-43|共2页
  • 作者

    Tony Bingham;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:34:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号