首页> 外文期刊>Building >5 MINUTES WITH...
【24h】

5 MINUTES WITH...

机译:5分钟......

获取原文
获取原文并翻译 | 示例
       

摘要

What has been your biggest career challenge? The quantity surveying for the Blavatnik extension at the Tate Modern was incredibly complex. It was a unique architectural masterpiece, where everything was bespoke. At times it felt like building a Swiss watch in the dark-it was very challenging! What have you worked on that you're most proud of? Most recently, my part in the action Aecom and the industry is taking to embrace offsite. Our modular solution with Rogers Stirk Harbour+Partners is evidence of the disruptive power of offsite: precision-engineered high-performing buildings, which significantly reduce environmental impact, cut waste and increase productivity without compromising quality.
机译:你最大的职业挑战是什么?在泰特现代的BlavaTnik延伸的数量测量是非常复杂的。这是一个独特的建筑杰作,一切都被定成了。有时它觉得像在黑暗中建造瑞士手表 - 这是非常具有挑战性的!你对你最为骄傲的是什么?最近,我在行动AECOM和该行业的部门采取了开场。我们的模块化解决方案与Rogers Strotk Harbour + Partners是现场破坏性的证据:精密工程的高性能建筑,这显着降低了环境影响,削减了浪费,提高了质量的情况而不会提高生产率。

著录项

  • 来源
    《Building》 |2020年第16期|18-18|共1页
  • 作者

    Peter Flint;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:31:26

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号