首页> 外文期刊>Building and Environment >Review of Critical Success Factors (CSFs) for green building projects
【24h】

Review of Critical Success Factors (CSFs) for green building projects

机译:审查绿色建筑项目的关键成功因素(CSF)

获取原文
获取原文并翻译 | 示例
       

摘要

In the past decade, many efforts have been devoted to exploring the Critical Success Factors (CSFs) for Green Building (GB) projects. However, there is absence of a systematic review exploring these studies. Therefore, the paper presents a comprehensive review of publications from 2005 to 2018 on CSFs for GB projects. The results indicate there is a growing interest in the exploration of CSFs for GB projects since 2010. The main contributing contributors, institutions, countries and areas, as well as research methods in this area are summarized. The mostly identified CSFs for GB projects are "communication and cooperation between project participants", "effective project planning and control", "owner's involvement and commitment", "clear goals and objectives" and "project manager's performance". The contractors and owners were found more related to these identified CSFs. Finally, knowledge gaps are discussed and future research directions including: (1) more studies on relationships between the CSFs; (2) extending studies to cover all building types; (3) more investigation on CSFs for different project objectives; (4) more emphasis on how to implement CSFs for GB projects are proposed. The results could offer a favorable reference for researchers to obtain a thorough picture of the current research woks and facilitate further study in this area. The discussion of GB CSFs could also broaden the understanding of the best ways for implementing GB projects to practitioners thereby reducing the setbacks towards its implementation.
机译:在过去的十年中,为探索绿色建筑(GB)项目的关键成功因素(CSF)做出了许多努力。但是,没有系统的评论来探讨这些研究。因此,本文对2005年至2018年有关GB项目的CSF的出版物进行了全面回顾。结果表明,自2010年以来,人们对GB项目的CSF探索越来越感兴趣。总结了该领域的主要贡献者,机构,国家和地区以及研究方法。对GB项目而言,最常见的CSF是“项目参与者之间的沟通与合作”,“有效的项目计划和控制”,“所有者的参与和承诺”,“明确的目标和目的”以及“项目”经理的业绩”。发现承包商和业主与这些确定的CSF更相关。最后,讨论了知识差距和未来的研究方向,包括:(1)关于脑脊液之间关系的更多研究; (2)将研究扩展到所有建筑物类型; (3)针对不同项目目标的CSF进行更多调查; (4)提出了更多关于如何为GB项目实施CSF的建议。研究结果可为研究人员全面了解当前的研究工作提供有益的参考,并有助于该领域的进一步研究。对GB CSF的讨论还可以使从业人员更好地理解实施GB项目的最佳方法,从而减少实施过程中的挫折。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号