首页> 外文期刊>Building design >Dixon Jones' Oxford plans stall as client queries cost
【24h】

Dixon Jones' Oxford plans stall as client queries cost

机译:狄克森·琼斯(Dixon Jones)的牛津计划因客户查询成本而停滞

获取原文
获取原文并翻译 | 示例
       

摘要

A flagship scheme by Dixon Jones to expand the prestigious Said Business School is to be delayed by at least a year in a fresh blow to Oxford University's expansion plans.rnWork on the £25 million building was due to start in the spring and be completed in 2010 with preparatory work already carried out by contractor Mace.rnBut the project stalled after Wafic Said, the Syrian-born billionaire arms dealer and benefactor of the school, raised concerns about whether he was getting value for money and called in an Oxford contractor for a "price check".
机译:迪克森·琼斯(Dixon Jones)的一项旗舰计划是扩建享有盛名的赛德商学院(Said Business School),这将对牛津大学的扩建计划造成至少一年的打击。这座耗资2500万英镑的建筑的工程将于春季开始,并于2007年完成。 2010年,承包商Mace已经进行了准备工作。但是,在出生于叙利亚的亿万富翁军火商,学校的捐助人Wafic Said对该项目是否物有所值表示担忧之后,该项目暂停了,他呼吁牛津承包商要求“价格检查”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号