STUART PTY LTD v CONDOR INSULATION PTY LTD [2006] NSWCA 334

机译:STUART PTY LTD诉CONDOR INSULATION PTY LTD [2006] NSWCA 334

获取原文
获取原文并翻译 | 示例
       

摘要

Suppose a subcontractor breaches its subcontract with the head contractor so seriously that the head contract is terminated by the principal. This may result in significant loss of profit to the head contractor under the head contract. The head contractor would want to recover this loss of profit from the subcontractor. But unless the subcontract is carefully drafted, the head contractor might not be able to recover this loss. The head contractor, through no fault of its own, could sustain significant loss which it would be unable to recover from the subcontractor whose breach of contract caused the loss.
机译:假设分包商严重违反了与总承包商的分包合同,以至总合同被委托人终止。根据总合同,这可能导致总承包商的利润严重损失。主承包商要从分包商那里收回利润损失。但是,除非精心设计了分包合同,否则总承包商可能无法弥补这一损失。总承包商本身没有任何过错,可以承受重大损失,无法从违反合同而造成损失的分包商那里收回。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号