Direction to rectify and/or complete under s 72 - Email service within time - Onus upon builder to prove email not opened within the time. The authority served two directions. One by post was not received within sufficient time so as to allow the statutory period of 28 days for carrying out the work. The other notice was sent by email and did thereafter allow the 28 days unless the builder proved it had not opened the email within such time as to allow the 28 days. The builder did not so prove.
机译:根据第72条进行更正和/或完成的指示-及时提供电子邮件服务-建设者有责任证明未在规定时间内打开电子邮件。当局服务于两个方向。在足够的时间内没有收到一个邮递员,以便在28天的法定期限内进行工作。另一则通知通过电子邮件发送,此后确实允许28天,除非构建者证明未在允许28天的时间内打开电子邮件。建造者没有如此证明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号