...
首页> 外文期刊>Brownfield briefing >McArthur mine contamination concerns
【24h】

McArthur mine contamination concerns

机译:麦克阿瑟矿山污染问题

获取原文
获取原文并翻译 | 示例

摘要

Decontamination of the McArthur river mine in Australia's Northern Territory could cost upwards of AUS$1bln, according to a Mineral Policy Institute report. The McArthur deposit in the gulf of Carpentaria is one of the world's largest lead, zinc, and silver resources, but concerns have been raised about acid mine damage, waste rock, tailings, and water management, especially relating to smoke that seen billowing from the waste rock. According to the report: "Concern about-and opposition to the mine has continued, with spikes of resistance occurring in relation to the river diversion, the 'burning waste dump', potential contamination of the river, fish, and grazing cows, pollution issues at the Bing Bong Port, and the inaccessibility of cultural sites on the mining lease."
机译:根据矿产政策研究所的报告,对澳大利亚北领地的麦克阿瑟河矿山进行净化处理可能会花费10亿澳元以上。卡彭塔利亚湾中的麦克阿瑟矿床是世界上最大的铅,锌和银资源之一,但人们对酸性矿山的破坏,rock石,尾矿和水管理提出了担忧,尤其是与从黑烟滚滚而来的烟雾有关。石。报告说:“对矿山的关注和反对仍在继续,与引水,抵制“焚烧垃圾场”,河流,鱼类和奶牛的潜在污染,污染问题有关的阻力激增。在冰峰港,而且采矿租约上的文化遗址也无法进入。”

著录项

  • 来源
    《Brownfield briefing 》 |2016年第183期| 8-8| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号