首页> 外文期刊>BOHSR newsletter >Overview of interim supervision of Provincial Highway No.1 during Construction of TIAA MRT CE01C Lot
【24h】

Overview of interim supervision of Provincial Highway No.1 during Construction of TIAA MRT CE01C Lot

机译:TIAA MRT CE01C地段施工期间省一级公路的临时监督概述

获取原文
获取原文并翻译 | 示例
       

摘要

The scope of this construction tender starts from the intersection of Zhongshan Road and Xinwu Road in Xinzhuang District to the intersection of Tianxiang Street. The route overlaps with Zhongshan Road and has a length of about 4,487 meters, using an overpass design for the entire section. The segment from the intersection of Zhongshan Road and Minsheng Road to Tianxiang Street (hereafter referred to as this section) will utilize a phrased approach based on the traffic maintenance plan. Before project implementation, confirmation sessions were held with the New Taipei City Transportation Department and the original maintenance units (Directorate General of Highways Zhonghe Public Works Section). In order to avoid cumbersome application procedures for pipeline relocation during construction, the Engineering office of BOHSR coordinated with the public work section to oversee the construction on their behalf to expedite project implementation.
机译:本工程招标的范围从新庄区中山路与新武路的交汇处到天翔街的交汇处。该路线与中山路重叠,全长约4,487米,整个路段均采用立交桥设计。从中山路与民生路交汇处到天祥街(以下简称本段)的路段将根据交通维护计划采用措辞法。在项目实施之前,与新北市交通运输部和原维修单位(公路总河道中和公共工程科)举行了确认会议。为了避免在施工过程中繁琐的管道搬迁申请程序,BOHSR的工程办公室与公共工程部门协调,代表他们监督施工,以加快项目的实施。

著录项

  • 来源
    《BOHSR newsletter》 |2013年第213期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:46:55

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号