...
首页> 外文期刊>BOHSR newsletter >Land Information Management System Operation Status
【24h】

Land Information Management System Operation Status

机译:土地信息管理系统运行状态

获取原文
获取原文并翻译 | 示例

摘要

From Taipei City, the northern end, to Kauhsiung City, the southern end, the total route-length of the "HSR Construction Project for Taiwan's Western Corridor" is 345 km. Passing 12 counties and 76 townships (i.e., Hsiangs, Towns, Cities, Districts), the 18,080 lots with a total area of 1295.3292 hectares required for the project, including routes, maintenance depots, and station land, were levied, appropriated, purchased, superficies-created, and agreed-for-use. By contractual agreement, they were delivered to THSRC for project construction and operation.
机译:从北端台北市到南端高雄市,“台湾西部走廊高铁建设项目”的总路线长度为345公里。通过了12个县和76个乡镇(即乡,镇,城市,区),征用,挪用,购买了18,080批土地,项目总面积为1295.3292公顷,包括路线,维修站和车站土地,创建并同意使用的表象。通过合同协议,将它们交付给THSRC进行项目建设和运营。

著录项

  • 来源
    《BOHSR newsletter》 |2013年第206期|7-7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号