首页> 外文期刊>BOHSR newsletter >The Use of GPS for Bridge Deck Facilities Control Measurements In TIAA MRT CE01 Tender
【24h】

The Use of GPS for Bridge Deck Facilities Control Measurements In TIAA MRT CE01 Tender

机译:GPS在TIAA MRT CE01招标中的桥面设施控制测量中的使用

获取原文
获取原文并翻译 | 示例
       

摘要

The work areas of CE01 tender work, with a total length of about 13.2 km, included three construction tenders: CE01B, CE01C and CE01 D. The construction must incorporate the controlled measurement operations for the continued track laying and ballasting. The ground level control points (CP) needed to be raised to bridge deck. In order to shorten the measurement operation and man-hour as well as to improve measurement accuracy, after deliberate discussions with the construction team, the global positioning system (GPS) was used to conduct the measurements
机译:CE01招标工作的工作区总长约13.2 km,包括三个施工招标:CE01B,CE01C和CE01D。施工必须包括受控的测量操作,以进行连续的铺设和压载。需要将地平面控制点(CP)升高到桥面。为了缩短测量工作量和工时并提高测量精度,在与施工团队进行了认真讨论之后,使用了全球定位系统(GPS)进行测量

著录项

  • 来源
    《BOHSR newsletter》 |2013年第205期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 23:46:50

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号