首页> 外文期刊>Benchmarking >Implementing the international benchmarking labour productivity theoretical model: the case of Iranian construction projects
【24h】

Implementing the international benchmarking labour productivity theoretical model: the case of Iranian construction projects

机译:实施国际基准劳动生产率理论模型:以伊朗建设项目为例

获取原文
获取原文并翻译 | 示例
           

摘要

Purpose - Building upon the results of a critical review of previous studies, the purpose of this paper is to present a framework to enhance the reliability of the theoretical model for international benchmarking of labour productivity (TMIBLP) method for construction project activities. The next part of the paper presents the results of implementing the proposed framework for construction activities in the Iranian construction industry. Design/methodology/approach - This paper draws upon a critical review of the literature to highlight the drawbacks of the previous studies concerning implementing TMIBLP within the construction industry. Identifying these shortcomings, the authors propose a framework for construction projects, which presents the procedure for deploying TMIBLP for construction activities in a reliable manner. The final section of the paper demonstrates the empirical implementation of the proposed framework within the Iranian construction industry. Findings - The primary contributions of the paper include: identifying the drawbacks of previous studies within the construction context, the framework that would lead construction managers towards more reliable implementation of benchmarking for construction projects, and determining the baseline of erecting steel structures in a developing country. Practical implications - A practical implementation of the TMIBLP method was presented to address the lack of research in Iran and to show the feasibility of using the framework developed. The authors investigated the daily labour productivity for the activity of structural steel erection for six projects in Tehran in order to determine the values of the baseline productivity for each project. Accordingly, the disruption index, performance ratio and project management index as the project benchmarks were calculated for all six projects. Originality/value - Underlining the necessity of implementing methods such as TMIBLP, this study outlines the outcomes of the first study on the benchmarking of construction activities deploying the proposed framework and using the data on erecting steel structures from six construction projects in Iran. The discussions provide guidelines for construction project managers regarding benchmarking labour productivity. The paper concludes with suggestions for future research opportunities.
机译:目的-在对以往研究进行严格审查的结果的基础上,本文的目的是提出一个框架,以提高用于建设项目活动的国际劳动生产率基准(TMIBLP)方法的理论模型的可靠性。本文的下一部分介绍了在伊朗建筑业中实施拟议的建筑活动框架的结果。设计/方法/方法-本文对文献进行了严格的审查,以强调先前有关在建筑业中实施TMIBLP的研究的弊端。为找出这些缺点,作者提出了一个建筑项目框架,该框架提出了以可靠方式将TMIBLP部署到建筑活动中的程序。本文的最后一部分说明了伊朗建筑行业中拟议框架的实证实施。调查结果-该论文的主要贡献包括:识别先前在建筑环境中进行的研究的弊端,该框架将引导建筑经理更加可靠地实施建筑项目基准测试,并确定发展中国家钢结构的基线建设。实际意义-提出了TMIBLP方法的实际实施方案,以解决伊朗缺乏研究并显示使用开发的框架的可行性。作者调查了德黑兰六个项目的钢结构架设活动的每日劳动生产率,以确定每个项目的基准生产率值。因此,计算了所有六个项目的破坏指数,绩效比率和项目管理指数作为项目基准。原创性/价值-强调实施TMIBLP之类的方法的必要性,本研究概述了有关部署拟议框架并使用伊朗六个建筑项目中钢结构建造数据的建筑活动基准测试的第一项研究结果。讨论为建设项目经理提供了基准劳动生产率的指南。本文最后提出了对未来研究机会的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号