...
首页> 外文期刊>Ships and shipping >New pulp mill in Uruguay will require deepwater port
【24h】

New pulp mill in Uruguay will require deepwater port

机译:乌拉圭新的纸浆厂将需要深水港

获取原文
获取原文并翻译 | 示例

摘要

Stora Enso and Arauco are joining forces in a 50/50 joint venture to build and operate a new state-of-the-art pulp mill in Montes del Plata, Uruguay, with an expected completion date in early 2013. Thanks to optimal weather conditions and fast-growing trees, South American eucalyptus plantations have geographic and horticultural advantages that allow South American producers to be at the low end of the cost curve. The Montes del Plata JV will also include a deepwater port to minimise transportation costs and will have a newly built power plant based on renewable resources in order to keep energy costs under control.
机译:斯道拉恩索(Stora Enso)和阿劳科(Arauco)正在建立50/50合资企业,在乌拉圭蒙特斯普拉塔(Montes del Plata)建造和运营一个新的最先进的纸浆厂,预计于2013年初竣工。和快速生长的树木,南美桉树人工林具有地理和园艺优势,使南美生产商处于成本曲线的低端。 Montes del Plata合资企业还将包括一个深水港,以最大程度地降低运输成本,并将拥有一个基于可再生资源的新建电厂,以控制能源成本。

著录项

  • 来源
    《Ships and shipping 》 |2011年第6期| p.11| 共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号