...
首页> 外文期刊>Aviation Week & Space Technology >BA609 Design Frozen; First Flight in 2001
【24h】

BA609 Design Frozen; First Flight in 2001

机译:BA609设计冻结; 2001年首飞

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Bell/Agusta Aerospace Co. is completing final design details for the BA609 civil tiltrotor and plans first flight for next year, followed by a test program leading to FAA certification in 2003. Jim Rogers, managing director of Bell/Agusta Aerospace, said the company has received 80 orders for the twin-engine 609 from customers in 18 countries. The aircraft combines the vertical lift advantages of a helicopter with the high-speed cruise performance of a turboprop business aircraft. He said a current delivery position is not available until 2006. Initial aircraft will be sold at $8-10 million, but pricing has not been established for later production aircraft.
机译:贝尔/阿古斯塔航空航天公司正在完成BA609民用倾转旋翼的最终设计细节,并计划于明年进行首飞,随后是一项测试计划,该计划于2003年获得美国联邦航空管理局(FAA)认证。已从18个国家的客户那里收到80架双引擎609的订单。该飞机将直升机的垂直升力优势与涡轮螺旋桨公务机的高速巡航性能结合在一起。他说,目前的交付位置要到2006年才能提供。最初的飞机将以8-10百万美元的价格出售,但尚未确定以后生产飞机的价格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号