首页> 外文期刊>Automation in construction >Particle swarm optimization-based schemes for resource-constrained project scheduling
【24h】

Particle swarm optimization-based schemes for resource-constrained project scheduling

机译:基于粒子群优化的资源受限项目调度方案

获取原文
获取原文并翻译 | 示例
           

摘要

Particle swarm optimization (PSO) performed through particle flying along the trajectory that will be continuously updated is based to develop a solution-solving scheme for the resource-constrained project scheduling problem (RCPSP). The potential solution to the RCPSP in view of minimizing project duration is represented by the multidimensional particle, where two solution representations, i.e., priority-based representation and permutation-based representation, are respectively considered. The frameworks of the PSOs for the RCPSP according to the two solution representations are developed. Experimental analyses are presented to investigate the performance of the proposed PSO-based methodology, including comparison of the two representations and comparison with other approaches for the RCPSP. The study aims at providing an alternative means for the RCPSP by utilizing the features of PSO, such as particle-updating mechanism that may benefit from the searching experience of one particle itself or the best of all particles in the swarm.
机译:通过沿轨迹不断飞行的粒子飞行执行的粒子群优化(PSO),将为资源受限的项目调度问题(RCPSP)开发解决方案。鉴于最小化项目工期,RCPSP的潜在解决方案由多维粒子表示,其中分别考虑了两种解决方案表示,即基于优先级的表示和基于置换的表示。根据两个解决方案表示,为RCPSP开发了PSO的框架。提出了实验分析,以研究所提出的基于PSO的方法的性能,包括两种表示的比较以及与RCPSP的其他方法的比较。该研究旨在通过利用PSO的功能为RCPSP提供替代方法,例如粒子更新机制可能会受益于单个粒子本身或群中所有粒子中最好的搜索经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号