Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling

机译:施工项目调度中使用混合进化算法的时间/成本优化

获取原文
获取原文并翻译 | 示例
           

摘要

This paper deals with construction project scheduling. In the literature on the subject one can find such scheduling methods as: the Linear Scheduling Model (LSM), Line of Balance (LOB) charts and CMP/PERT network planning. The methods take into account several objective functions: the least cost, the least time, limited resources, work priorities, etc., both in the deterministic and probabilistic approach. The paper presents an analysis of the time/cost relationship, performed using time coupling method TCM III. A modified hybrid evolutionary algorithm (HEA) developed by Bozejko and Wodecki (A Hybrid Evolutionary Algorithm for Some Discrete Optimization Problems. IEEE Computer Society, 325-331,2005) was used for optimization.
机译:本文涉及建设项目的进度安排。在有关该主题的文献中,可以找到诸如线性计划模型(LSM),平衡线(LOB)图和CMP / PERT网络计划之类的计划方法。这些方法在确定性和概率方法中都考虑了几个目标功能:最少的成本,最少的时间,有限的资源,工作优先级等。本文介绍了使用时间耦合方法TCM III进行的时间/成本关系分析。 Bozejko和Wodecki开发了一种改进的混合进化算法(HEA)(用于解决一些离散优化问题的混合进化算法,IEEE计算机协会,325-331,2005)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号