首页> 外文期刊>Automation in construction >Application of computer simulation to bridge deck construction: Case study
【24h】

Application of computer simulation to bridge deck construction: Case study

机译:计算机仿真在桥面施工中的应用:案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

Bridge deck construction is performed in a cyclic manner and it involves different types of interacted resources. This paper presents a case study that discusses how computer simulation is used to aid bridges' contractors in planning of bridges' decks, taking into consideration the interaction amongst involved resources. As such, total duration of deck execution and the associated total costs, including direct and indirect costs, can be estimated. El-Warrak Bridge, which is a part of the Ring Road of Cairo, Egypt, is analyzed in a step-by-step procedure to demonstrate the capability of computer simulation in modeling construction of bridges' decks using cast-in-place on falsework and cantilever carriage construction methods. The presented methodology proves its practicality to contractors in estimating the time and costs of the repetitive process of bridge deck construction, considering complex interdependencies between construction resources and the uncertainties associated with construction activities.
机译:桥面的施工以循环方式进行,涉及不同类型的交互资源。本文提出了一个案例研究,其中讨论了如何使用计算机仿真来帮助桥梁承包商规划桥面,同时考虑了相关资源之间的相互作用。这样,可以估计甲板执行的总持续时间以及相关的总成本,包括直接和间接成本。 El-Warrak桥是埃及开罗环城公路的一部分,分步进行了分析,以演示计算机模拟在桥架上进行模铸的模架施工中建模的能力和悬臂式车架的建造方法。考虑到施工资源之间的复杂相互依赖关系以及与施工活动相关的不确定性,所提出的方法论向承包商证明了其在重复桥面板施工过程中的时间和成本方面的实用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号