首页> 外文期刊>Automation in construction >Application of 4D visualization technology for safety management in metro construction
【24h】

Application of 4D visualization technology for safety management in metro construction

机译:4D可视化技术在地铁施工安全管理中的应用

获取原文
获取原文并翻译 | 示例
       

摘要

Safety accidents occur frequently in underground metro construction due to its complexity. These accidents cause huge losses because most metro construction is located in the center of very congested cities. Therefore, safety management is a priority in the metro construction industry. This paper proposes an approach for safety management using visualization technology. Safety is integrated with the construction management process throughout the project life cycle. Information from the design phase about construction components and scheduling has been gathered to formulate a 4 dimensional (4D) model. Before construction begins, a rule-based tool analyzes this combined information, automatically detects potentially unsafe activities and conditions and provides instructions for correction. More importantly, actual site monitoring data are continuously compared to the 4D model during the construction process. Therefore, the safety status of related components can be continuously visualized in the system as conditions change and potential safety risks evolve. This paper presents a prototype which was developed and verified with a case study of a real project. The results show that the proposed approach can be a tool of collaboration, virtual analysis and prediction for designers, site project managers, safety engineers and other participants. With real-time safety status visualized, it can detect safety risks before and during the construction process and then provide preventive measures. Thus, timely decisions can be made to avoid accidents. This contributes to the success of safety management in the metro construction industry.
机译:由于其复杂性,地下地铁施工中经常发生安全事故。这些事故造成了巨大的损失,因为大多数地铁建设都位于非常拥挤的城市中心。因此,安全管理是地铁建设行业的首要任务。本文提出了一种使用可视化技术进行安全管理的方法。在整个项目生命周期中,安全性都与施工管理流程集成在一起。已从设计阶段收集了有关施工部件和调度的信息,以制定4维(4D)模型。在开始施工之前,基于规则的工具会分析这些组合信息,自动检测潜在的不安全活动和状况,并提供纠正指示。更重要的是,在施工过程中,将实际的现场监控数据与4D模型进行连续比较。因此,随着条件的变化和潜在的安全风险的发展,相关组件的安全状态可以在系统中连续显示。本文介绍了一个原型,该原型是通过对真实项目的案例研究开发和验证的。结果表明,该方法可以为设计师,现场项目经理,安全工程师和其他参与者提供协作,虚拟分析和预测的工具。通过可视化的实时安全状态,它可以在施工过程中和之前检测安全风险,然后提供预防措施。因此,可以及时做出决定以避免发生事故。这有助于地铁建筑行业安全管理的成功。

著录项

  • 来源
    《Automation in construction》 |2013年第9期|25-36|共12页
  • 作者

    Y.Zhou; LY. Ding; L.J. Chen;

  • 作者单位

    School of Civil Engineering & Mechanics, Huazhong University of Science & Technology, Wuhan, 430074, China;

    School of Civil Engineering & Mechanics, Huazhong University of Science & Technology, Wuhan, 430074, China;

    Hubei Key Laboratory of Control Structure, Huazhong University of Science & Technology, Wuhan,430074, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Metro construction; Safety management; Visualization technology; 4D;

    机译:地铁建设;安全管理;可视化技术;4D;
  • 入库时间 2022-08-17 23:51:30

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号