首页> 外文期刊>Australian defence magazine >Affordability, not capability, to drive Nulka enhancement
【24h】

Affordability, not capability, to drive Nulka enhancement

机译:负担能力而非能力来推动Nulka的提升

获取原文
获取原文并翻译 | 示例
           

摘要

The Nulka Active Missile Decoy (AMD) program will pass further milestones over the next year or so when Phases 5A and then 5D of the Nulka Project, Sea 1397, come up for 1st Pass approval.rnSenior Defence sources have dampened down speculation, however, that these phases will see significant capability enhancements to the Nulka round itself, for which BAE Systems Australia in Melbourne is the prime contractor.
机译:Nulka主动导弹诱饵(AMD)计划将在明年左右通过Nulka项目Sea 1397的第5A阶段和第5D阶段获得第一阶段通行证的进一步里程碑。rn。高级国防消息来源抑制了猜测,但是,这些阶段将使Nulka巡回赛本身的能力得到显着增强,墨尔本的BAE Systems Australia是其主要承包商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号