首页> 外文期刊>Australian defence magazine >NAVANTIA CUTS FIRST STEEL FOR SECOND LHD
【24h】

NAVANTIA CUTS FIRST STEEL FOR SECOND LHD

机译:Navantia切割第二种LHD的第一钢

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Navantia has begun construction of Australia's second Canberra-class Landing Helicopter Dock (LHD 02) at its Ferrol yard in northern Spain.rn"This is a great achievement, with the steel being cut by Navantia seven weeks ahead of schedule," Minister for Defence Materiel Greg Combet said.rnBAE Systems Australia is prime contractor for the program to deliver two 27,000 tonne LHDs, that will form part of the ADF's broader amphibious deployment and sus-tainment system. The LHD is based on Na-vantia's BPE design for the Spanish Navy.
机译:纳万提亚已经在其西班牙北部的费罗尔船厂开始建造澳大利亚的第二架堪培拉级登陆直升机船坞(LHD 02)。rn“这是一项伟大的成就,纳万提亚比原定计划提前了七个星期对钢材进行了切割。” Materiel Greg Combet表示。澳大利亚BAE系统公司是该计划的主要承包商,该计划将交付两台27,000吨的LHD,这将成为ADF更广泛的两栖部署和维持系统的一部分。 LHD基于Na-vantia为西班牙海军设计的BPE。

著录项

  • 来源
    《Australian defence magazine》 |2010年第3期|p.10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号